[Jul 24, 2022] Pass C-TS422-2020 Review Guide, Reliable C-TS422-2020 Test Engine [Q88-Q104]

Share

[Jul 24, 2022] Pass C-TS422-2020 Review Guide, Reliable C-TS422-2020 Test Engine

C-TS422-2020 Test Engine Practice Test Questions, Exam Dumps


SAP C-TS422-2020 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Select and apply planning strategies, use the planning table, characterize long-term planning
  • Determine master data objects for process orders
Topic 2
  • Characterize process order elements and process order processing
  • Outline the basics and master data of advanced planning
Topic 3
  • Material Requirements Planning in SAP S
  • 4HANA
  • Describe its main components, the lines of business, and the SAP User Experience strategy
Topic 4
  • Introduction to SAP S
  • 4HANA Supply Chain Planning
  • Identify features for Good Manufacturing Practices (GMP)
Topic 5
  • Identify and explain production relevant master data
  • Outline best practices for using SAP S
  • 4HANA
Topic 6
  • Explain and compare the different production methods in make-to-order
  • Determine BOM item category, describe order status management and set user statuses
Topic 7
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Explain line load planning and confirmation, outline Kanban master data and Kanban processes

 

NEW QUESTION 88
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

  • A. Find Slot
  • B. Squeezing
  • C. Insert operation
  • D. Scheduling working time only

Answer: A

 

NEW QUESTION 89
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.

  • A. Planning
  • B. Inspection during production
  • C. Engineering change management
  • D. Implementation

Answer: A,D

 

NEW QUESTION 90
A material has been set up as a phantomassembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?

  • A. Change the phantom item indicator for the phantom assembly in the BOM.
  • B. Change the explosion type of the phantom assembly in the BOM.
  • C. Change the special procurement key of the phantom assembly in the BOM.
  • D. Change the item category of the phantom assembly in the BOM.

Answer: B

 

NEW QUESTION 91
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Wait time
  • B. Float before production
  • C. Queue time
  • D. Pick/pack time
  • E. Move time

Answer: A,C,D

 

NEW QUESTION 92
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
  • B. An evaluation that is ordered according to thebill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
  • C. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
  • D. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.

Answer: B

 

NEW QUESTION 93
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Manual planning without check
  • B. Material requirements planning
  • C. Consumption-based planning
  • D. Forecast planning

Answer: C

 

NEW QUESTION 94
Your client is asking for your advice on material master numbering in SAP S/4HANA.
What do you need to consider? Note: There are 2 correct answers to this question.

  • A. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
  • B. The number of leading zeros for internal numbers is client-specific.
  • C. The display template for material numbers applies to all clients.
  • D. In Customizing you can decide by material type whether to use the long material number.

Answer: A,C

 

NEW QUESTION 95
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question.

  • A. Manually firm all planned orders for materials within the replenishment lead time of the material
  • B. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
  • C. In the material master record, set MRP type to PI and a planning time fence on the replenishment lead time of the material
  • D. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material

Answer: A,D

 

NEW QUESTION 96
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.

  • A. Setup time
  • B. Total replenishment lead time
  • C. Float after production
  • D. Planned delivery time

Answer: C,D

 

NEW QUESTION 97
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

  • A. The previously dispatched operation stays as is the new operation is insertedafter the dispatched operation.
  • B. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.
  • C. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
  • D. The new operation is inserted at the desired time the previously dispatched operation is moved backward.

Answer: D

 

NEW QUESTION 98
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

  • A. Specify a negative planning horizon in the strategy profile.
  • B. Specify a positive planning horizon in the strategy profile.
  • C. Specify a negative offset time in the strategy profile.
  • D. Specify a positive offset time in the strategy profile.

Answer: C

 

NEW QUESTION 99
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.

  • A. Finiteness level (0...1)
  • B. Planning mode (bucket/sequence)
  • C. Fixed pegging (on/off)
  • D. Scheduling control (finite/infinite)
  • E. Direction (forward/backward)

Answer: B,D,E

 

NEW QUESTION 100
How Is the bill of material (BOM) exploded when you use a BOM explosion number?

  • A. With respect to defined separate key dates for product and each assembly
  • B. With respect to a common key date for product and each assembly
  • C. With respect to a common change status for product and each assembly
  • D. With respect to a defined separate change status for product and each assembly

Answer: A

 

NEW QUESTION 101
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Quantity
  • B. Scrap percentage
  • C. Installation point
  • D. Item type

Answer: A,C

 

NEW QUESTION 102
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?

  • A. Use the MRP type for vendor managed inventory.
  • B. Use the fixed lot size procedure.
  • C. Use the minimum order quantity.
  • D. Use the reorder point.

Answer: B

 

NEW QUESTION 103
In which data object is the production line (Repetitive manufacturing relevant work center) maintained?

  • A. Bil1 of material
  • B. Production version
  • C. Cost collector
  • D. Repetitive manufacturing profile

Answer: B

 

NEW QUESTION 104
......


SAP S/4HANA Production Planning and Manufacturing Certification Exam Details:

Sample QuestionsSAP S/4HANA Production Planning and Manufacturing Certification Sample Questions
Exam CodeC_TS422_2020
Reference BooksTS421, TS422 (SAP S/4HANA 2020)
TS421 (SAP S/4HANA 1909), TS422 (SAP S/4HANA 1909)
Passing ScoreC_TS422_2020 - 56%
C_TS422_1909 - 55%
Exam Price$550 (USD)
LevelAssociate

 

100% Free C-TS422-2020 Daily Practice Exam With 150 Questions: https://www.examcost.com/C-TS422-2020-practice-exam.html

C-TS422-2020 exam torrent SAP study guide: https://drive.google.com/open?id=15jeOYVbj76IeFLc_BR0dyZBhOSnBMDe7