E_S4HCON2023 Dumps To Pass SAP Certified Technology Specialist Exam in One Day (Updated 82 Questions) [Q25-Q48]

Share

E_S4HCON2023 Dumps To Pass SAP Certified Technology Specialist Exam in One Day (Updated 82 Questions)

E_S4HCON2023 Exam Brain Dumps - Study Notes and Theory

NEW QUESTION # 25
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. Upgrading to SAP ECC 6.08 without using DMO
  • B. Using DMO when applying Support Packages to SAP ECC 6.07
  • C. SAP S/4HANA conversion to SAP S/4HANA 1709
  • D. Updating to SAP ECC 6.07 using DMO

Answer: A,C


NEW QUESTION # 26
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. Dedicated application tables are migrated in uptime
  • B. TABIMJJPG is executed in uptime
  • C. The repository is migrated in uptime
  • D. An additional temporary database is used during uptime

Answer: A


NEW QUESTION # 27
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:

  • A. An upgrade of the software components is performed, without changing the database type.
  • B. A change of the database type is performed, without changing the software components.
  • C. An SAP S/4HANA conversion is performed, without adapting the customer data.
  • D. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.

Answer: B


NEW QUESTION # 28
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?

  • A. EU_CLONE_MIG_DT_RUN
  • B. EU_IMPORT_ALL
  • C. EU_CLONE_MIG_SOT_RUN
  • D. EU_CLONE_MIG_DT_CREATE

Answer: A


NEW QUESTION # 29
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

  • A. SAP S/4HANA conversion without DMO
  • B. DMO without system update
  • C. Prerequisite check
  • D. SAP S/4HANA conversion including DMO
  • E. Benchmark tool

Answer: A,C,D


NEW QUESTION # 30
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:

  • A. The SAP Support Packages contained in the upgrade media
  • B. The SAP Support Packages that will be bound to the upgrade
  • C. The SAP Support Packages found in the download directory
  • D. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner

Answer: C


NEW QUESTION # 31
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

  • A. The start of the Execution roadmap step
  • B. The end of the database migration
  • C. The start of the business downtime
  • D. The end of the business downtime

Answer: D


NEW QUESTION # 32
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?

  • A. Without table contents comparison, only 40 R3load processes are being started.
  • B. There are 40 Reload processes used for copying and 40 Reload processes for table count verification.
  • C. SUM is still running in uptime; the 40 defined Reload processes are considered.
  • D. These are 40 pairs of Reload processes, so there are 80 R3load processes running.

Answer: A


NEW QUESTION # 33
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU
    &UC) procedure.
  • B. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
  • C. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
  • D. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.

Answer: D


NEW QUESTION # 34
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?

  • A. The SAP support packages that will be bound to the conversion
  • B. The SAP support packages of the support package stack, calculated by the maintenance planner
  • C. The SAP support packages in the download directory that are newer than the selected support package stack
  • D. The SAP support packages contained in the upgrade media, calculated by the maintenance planner

Answer: C


NEW QUESTION # 35
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
  • B. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
  • C. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
  • D. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.

Answer: D


NEW QUESTION # 36
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
  • B. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
  • C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • D. After the SUM roadmap step "Postprocessing" and post procedure steps are finished

Answer: A


NEW QUESTION # 37
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A. Unicode conversion SAP S/4HANA conversion without database migration Database migration
  • B. Unicode conversion SAP S/4HANA conversion including database migration
  • C. Unicode conversion Database migration SAP S/4HANA conversion without database migration
  • D. SAP S/4HANA conversion including database migration and Unicode conversion
  • E. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration

Answer: B,C,E


NEW QUESTION # 38
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for source release, Windows, SAP MaxDB
  • B. Kernel for target release, Windows, SAP MaxDB
  • C. Kernel for target release, Linux, SAP HANA
  • D. Kernel for target release, Windows, SAP HANA

Answer: A,D


NEW QUESTION # 39
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.

  • A. The path is taken from the URL entered in the browser to start SUM
  • B. The path was stored in file host_profile during registration
  • C. The path was stored to the environment of user <sid>adm during registration
  • D. The path was stored in file sumabap conf during registration

Answer: D


NEW QUESTION # 40
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D


NEW QUESTION # 41
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In DMO Migration Preparation
  • B. In Process Control Center
  • C. In SUM Parameters
  • D. In SUM Phaselist

Answer: B,C


NEW QUESTION # 42
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:

  • A. Assign the transport request as a modification adjustment transport
  • B. Create "modified* versions of the objects that you need to adjust
  • C. Release the transport request containing the modification adjustment
  • D. Manually activate the adjusted dictionary objects

Answer: A,B


NEW QUESTION # 43
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:

  • A. ParaUel distribution (PARDIST_SHD)
  • B. Downtime migration (EU_CLONE_MIG_DT_RUN)
  • C. Shadow repository creation (EU_IMPORT*)
  • D. Uptime migration (EU_CLONE_MIG_UT_RUN)

Answer: D


NEW QUESTION # 44
What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.

  • A. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework
  • B. The errors from the SI checks must be solved, otherwise. SUM will report an error
  • C. You need to build up an SI check framework by applying SAP Notes
  • D. The SI checks are executed in the development system and the results are transported into the subsequent systems

Answer: A,C


NEW QUESTION # 45
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.

  • A. Database migration
  • B. Unicode conversion
  • C. Custom code analysis
  • D. Software update

Answer: A,D


NEW QUESTION # 46
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

  • A. AA
  • B. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.

Answer: B


NEW QUESTION # 47
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question

  • A. Use DMO for SUM
  • B. Apply SAP support packages
  • C. Upgrade the SAP system
  • D. Perform an SAP S/4 HANA conversion including DMO
  • E. Perform an SAP S/4 HANA conversion without DMO

Answer: A,B,C


NEW QUESTION # 48
......


SAP E_S4HCON2023 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe the handling of the SAP system landscape during SAP S
  • 4HANA conversion and SAP system upgrade: Managing the SAP system landscape involves strategic planning for compatibility with SAP S
  • 4HANA. Consultants learn to assess dependencies among systems to facilitate a seamless transition with minimal disruption.
Topic 2
  • Monitor and troubleshoot the SUM procedure: SAP Consultants gain skills in monitoring logs and error messages during the SUM procedure. This proactive approach helps them identify issues early, minimizing downtime during upgrades.
Topic 3
  • Perform the SUM prepare part: In the SUM prepare part, aspiring SAP consultants verify system prerequisites and execute the SAP Readiness Check. They also learn to prepare custom code for adaptation, reducing risks in the conversion process.
Topic 4
  • Describe the necessary manual preparation and follow-on activities for SUM: Manual preparation for SUM involves performing readiness checks and adjusting custom code to ensure system compatibility. SAP Consultants gain skills in validating data migrations to mitigate risks during the upgrade.
Topic 5
  • Describe the factors influencing downtime and techniques to reduce downtime: In this topic, SAP Consultants explore factors influencing downtime, such as system complexity and data volume. They learn techniques for optimizing performance and leveraging migration tools to reduce downtime during upgrades.

 

E_S4HCON2023 Dumps PDF - Want To Pass E_S4HCON2023 Fast: https://www.examcost.com/E_S4HCON2023-practice-exam.html

100% Guaranteed Results E_S4HCON2023 Unlimited 82 Questions: https://drive.google.com/open?id=1GSA_tyLMUl08kzZWCc6RKG9yOWB3MtBi